| KNOWN COST GROWTHS |
|
| Construction (excludes operational cost growth) | |
|
|
|
|
|
|
| Construction and Operational | |
|
|
|
| Clean up and Lay Away ($200M per site, 9 sites) |
|
| Operational Extension (rocket and H solidification) |
|
| CSEPP |
|
|
|
|
| LIKELY COST INCREASES | |
| Construction | |
|
|
|
|
|
|
|
|
|
|
|
|
| Operational Increases |
|
| CSEPP |
|
| Reserve |
|
|
|
|
This document was provided, November 2000, to the CWWG from
a source inside Government who wishes to remain anonymous.
It is a reconstructed summary page based on the information
contained
in the original cost report done in the July -September time frame,
2000. The report is close-hold inside PMCD. We have not seen
the original report, but the source who provided it is reliable
and the existence of the actual report, and the accuracy of this
summary, have been verified by three additional sources.